Concentrated water stream
A jet outlet for targeted water delivery and cooling duty.
Product photograph shows a representative configuration. Confirm the selected material, size and connections with your quotation.
FROZENFIRE · Water jet
A focused stream for your monitor.
Monitor-mounted water jet nozzle with four catalogue size and bore combinations.
PRODUCT OVERVIEW
The Jet Nozzle delivers a concentrated water stream from a compatible fire monitor for targeted firefighting and equipment cooling.
Select the size, outlet bore, material and connection against the required duty. The catalogue lists four model references with flow values at 7 bar.
A jet outlet for targeted water delivery and cooling duty.
Four bore and nominal-size combinations are listed in the source catalogue.
Specify the material with the required connection and operating conditions.
TECHNICAL SPECIFICATIONS
Specifications from the matching Frozenfire catalogue. Confirm the approved configuration for your project.
Download catalogue| Parameter | Specification |
|---|---|
| Application medium | Water |
| Material options | Aluminium / stainless steel / gunmetal |
| Nominal sizes | 50 / 63 / 75 / 100 mm |
| Outlet bore options | 26 / 32 / 38 / 45 mm |
| Operating pressure | 7–12 bar; recommended 7 bar |
| Maximum working pressure | 16 bar |
| Mounting | Compatible fire monitor outlet |
| Routine care | Flush with clean water after use |
MODEL SELECTION
Select the model reference with your required material, connection and operating arrangement.
On smaller screens, scroll across for all model details.
| Model | Size | Outlet bore | Flow | Pressure |
|---|---|---|---|---|
| FIL/JN/50 | 50 mm | 26 mm | 1000 LPM | 7 bar |
| FIL/JN/63 | 63 mm | 32 mm | 1750 LPM | 7 bar |
| FIL/JN/75 | 75 mm | 38 mm | 2580 LPM | 7 bar |
| FIL/JN/100 | 100 mm | 45 mm | 3500 LPM | 7 bar |
Values follow the Jet Nozzle model table. Confirm the approved duty and connection for the selected monitor.
APPLICATIONS
Application areas described in the catalogue. Final selection depends on the complete system and operating requirements.
OPERATION & INSPECTION
Use the original catalogue and the instructions applicable to your selected assembly.
Inspect the nozzle and connections, clear the water passage and secure the monitor before use.
Introduce the water supply gradually and follow the selected monitor’s operating procedure.
Flush after use and inspect the passage, seals and connections. Isolate and depressurize before service; use approved replacement parts.
DOCUMENTS & ENQUIRIES
Keep the original catalogue alongside the selected model and quotation.
Original Frozenfire catalogue
Include these details in your enquiry